Abstract

ABSTRACT In this research, we look the setup, processing, and removal times as separatable, then take the sequence-independent setup and dependent removal times into account when deal with an open shop scheduling problem with the objective to minimize the total job tardiness. The addressed problem is first described as a 0-1 integer programming model, and following, a simulated annealing based heuristic is proposed to get an near optimal schedule in a reasonable computation time. During the research, the parameters used in the heuristics that affect the solution quality and efficiency are analyzed and designed; then for the constructed heuristic, a good parameter setting is suggested. The experimental results are reported, and provided for the references for the further research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.