Abstract
The paper summarises the main challenges and problems related to customised mass production. In the elaborated solution the reference for real-time production control is generated by a novel scheduling system. Detection of changes and disturbances emerging during the daily production is based on the integration of information coming from the process, quality and production monitoring subsystems. All the information forms the basis of rescheduling policies. In the proposed framework both the more traditional discrete event simulation (in different settings) and the agent-based approach plays key role. The effectiveness of the proposed solutions is shown by experimental results on industrial data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.