Abstract

This study presents the options for source-segregation and selective collection of recyclable waste fractions for Cetinje, Montenegro, with the aim of meeting the European Union 50% waste recycling target in 2023, and extending collection and disposal system that builds on the existing strengths of the city. To this end, three options were considered: (1) source separation and separate collection of dry recyclable materials and central sorting of residual waste; (2) source separation and collection of co-mingled dry recyclable materials, and central sorting in a clean material recovery facility of comingled recyclables and central sorting of residual waste; (3) collection of mixed waste (current situation) and subsequent central sorting. Scenarios 1 and 2 were found to meet the European Union 50% recycling target in 2023, provided that a fast implementation of the new separate collection schemes to fine sort the co-mingled collected recyclable materials is available. Finally, a financial evaluation was made for the options and the investment and operational costs over a 20-year period were estimated. Unit costs for Scenario 3 were found to be lower than for Scenario 1 and 2. As Scenario 3 will not meet the future European Union recycling targets, Scenario 2 has been pointed as the most feasible scenario for Cetinje, with reference to the expected lower total costs compared with Scenario 1.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.