Abstract

Concentrating solar power (CSP)-biomass hybrids plants are becoming increasingly interesting as a low cost option to provide dispatchable renewable energy since the first reference plant commenced operation late 2012, 22.5MWe Termosolar Borges in Spain. The development of such project is a complex task with not only one but two energy sources required to make the project successful. The availability of several studies but only one reference plant worldwide is proof of that.This paper investigates the hybridisation of a biomass power plant with a molten salt solar tower system. The benefit of this combination is a high cycle efficiency as both the steam generators can provide steam at 525°C and 120bar to the steam turbine. A case study approach is used to provide technical, economic and environmental benefits of a 30MWe CSP-biomass plant with 3h thermal storage in Griffith, New South Wales. At this site such a plant could provide annually 160,300MWh of electricity with an annual average electricity price of AU$155/MWh. Compared to a standalone CSP plant with 15h of thermal storage the hybrid plant investment is 43% lower, providing a possibility to fast-track CSP implementation in countries where CSP is struggling to enter the market due to low wholesale electricity prices, such as Australia.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.