Abstract
This report describes the results of a study to determine control system design features and to propose innovative conceptual approaches necessary to increase the productivity of operation and maintenance personnel required to operate a solar thermal central receiver power plant. This study utilized experience gained at the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates: Southern California Edison, the Los Angeles Department of Water and Power, and the California Energy Commission. 13 figs., 5 tabs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.