Abstract

The disturbance of Shanghai silty clay during earth pressure balance (EPB) tunnelling has been studied through field monitoring, field measurement and laboratory test. The soil disturbance during tunnelling consists of two parts: stress disturbance, which is the change of effective stress; and strain disturbance, which is caused by the soil movement. The definition of stress disturbance degree of Shanghai silty clay is given by the change in the in situ effective stress before and just after tunnelling at the same site. According to the changes in the static cone penetrometer resistance, the extent of stress disturbance in a transverse section is determined. The relationships between the mechanical properties and stress disturbance degree are also studied.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call