Abstract

AbstractSoil clogging occurred in the early construction stage of Nanchang Metro Line 1, China, when an earth balance pressure (EPB) shield passed through the argillaceous siltstone with a total content of clay minerals of 40.5%. This paper presents a new scheme for determining soil conditioning parameters to avoid the occurrence of soil clogging, taking both the slump value and the liquidity index of the soil into account. As indicated by the results of slump tests, the optimum slump value for the soil conditioning ranged from 17 to 20 cm, and a fitting function of slump value against foam injection ratio (FIR) and water content (w) was obtained. Considering the requirement for a liquidity index equal to ∼0.4–0.75 to ensure the stability of the excavation face, a chart was proposed for the soil conditioning. Based on the chart, the optimum FIR and w for the soil conditioning for tunneling in argillaceous siltstone were determined to be ∼19.2–23.2% and ∼14.2–36.6%, respectively. Taking shield parameters, ...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.