Abstract

Highways play an important role in countries’ economy improvement as they are the major transportation facilities. Highway construction project needs effective planning method to overcome its complicity. Line of Balance is the most effective technique for scheduling such projects. Computerization of this technique to cover highway construction is very powerful to obtain the full advantages of this technique as computer-based program can simplify the mission of end users. The software was build using Visual Basic to ensure flexible code and interactive user-interface. The developed software was verified and validated through extensive testing during and after its building. The result of test showed its correctness and effectiveness to attain objectives

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.