Abstract
Technical complexity has always been considered a factor which affects project performance. Scheduling and other mechanisms have been proposed which allow for the management of these effects. However, the effect of the complexity of interconnections, and in particular those caused by social interfaces and boundaries between the various teams, have not been investigated. Socio-organo complexity is caused by interconnections which if not managed could lead to a reduction in performance. Understanding the characteristics of complexity of interconnections, how these affect project schedule performance and what deductions can be extracted, will enable the development and implementation of innovative actions and tools that will support the management of the effects of complexity through the respective processes. The authors present results of five case studies, with UK construction organisations, which demonstrate that the effects of socio-organo complexity of interconnections have similarities with the behaviour of underdamped control systems. The results from the study have significant implications for the way socio-organisational issues are managed but will also enable parallels to be drawn between the fields of project management and control systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.