Abstract

AbstractDuring the snowmelt season, surface runoff into northern Canadian Shield lakes is governed by the distribution of snow and its ablation, storage in catchment slopes and valleys, and flow delivery from uplands, bottomlands and from upper lakes. For the lake studied, time lags exist between the commencement of snowmelt and the arrival of runoff to the lake, with evaporation from the uplands and bottomlands consuming some of the meltwater produced. Inflow from an upper lake is delayed. With all these inputs, the lake becomes flooded, first forming a moat, followed by an expansion of the open water areas, which are subject to evaporation loss. Lake outflow begins when water level rises above the outlet threshold. For the snowmelt season, outflow constitutes 40% of total melt and rainfall. The lake itself is a major storage that continues to maintain outflow until the lake level drops below the threshold in early summer, after which flow ceases. Snowmelt is the main period when runoff is generated from the headwater catchment to replenish storage depleted in the previous summer, and to produce flow along the Shield valley that contains a chain of lakes. Copyright © 2006 John Wiley & Sons, Ltd.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.