Abstract

We present a new set of simulation models, organized in a testbed. The aim of the testbed consists in providing researchers with a platform able to credibly represent the complexity of modern semiconductor manufacturing. The testbed is open to public use, and include so far four models. A high-volume/low-mix model and a low-volume/high-mix model constitutes the foundation of the testbed. Two additional models incorporate the complexity of engineering lots. We conclude this paper by presenting a case study that demonstrates that the third and fourth model can be used to assess the performance of integrated dispatching strategies for production and engineering lots.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call