Abstract

Aiming at the problem of poor accuracy of traditional substation environmental smoke remote monitoring, a remote monitoring method of substation environmental fan linkage system is proposed. This article optimizes the smoke remote monitoring equipment, thereby improving the monitoring sensitivity. The smoke concentration level is further divided, and the smoke level warning setting of the fan linkage system is realized. On this basis, the remote smoke monitoring process of the substation environmental fan linkage system is optimized, thereby improving the efficiency of remote monitoring and early warning of substation smoke, and strengthening the effect of remote monitoring of substation environmental smoke. The experimental results show that the proposed remote monitoring method for the flue gas of the substation environmental fan linkage system has high monitoring accuracy in the actual application process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.