Abstract

Purpose – The purpose of this paper is to uncover the significance of quick changeovers in die‐casting foundry environments.Design/methodology/approach – The paper gives set‐up instructions and guidelines to prepare the standardized set‐up procedure without ignoring actual constraints in foundries. It uses a case study in a medium scale piston foundry to generate an integrated set‐up reduction approach, utilizing single minute exchange of die (SMED)‐based industrial engineering tools to achieve faster set‐ups. It describes the feasibility of quick changeovers in foundry small and medium enterprises based on a “SMED” approach. Finally, the paper carries out empirical analysis of the financial/non‐financial benefits incurred from set‐up reductions.Findings – Set‐up activities are a vital part of the production lead‐time of any product and so affect overall product cost. Tools like Pareto analysis, root‐cause analysis and method study have been used to analyze the existing procedure of set‐ups. A SMED approa...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.