Abstract

Increasing amounts of intermittent renewable energy sources (RES) are being integrated into energy systems worldwide. Due to the nature of these sources, they are found to increase the importance of mechanisms for balancing the electricity system. Small-scale combined heat and power (CHP) plants based on gas have proven their ability to participate in the electricity system balancing, and can hence be used to facilitate an integration of intermittent RES into electricity systems. Within the EU electricity system, balancing reserves have to be procured on a market basis. This paper investigates the ability and challenges of a small-scale CHP plant based on natural gas to participate in the German balancing reserve for secondary control. It is found that CHP plants have to account for more potential losses than traditional power plants. However, it is also found that the effect of these losses can be reduced by increasing the flexibility of the CHP unit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.