Abstract

Slow resonant extraction from the Fermilab Main Injector through the extraction channel was achieved in February 2000, with a spill length of 0.3 sec. Beam losses were small. Excellent wire chamber profiles were obtained and analyzed. The duty factor was not very good and needs to be improved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call