Abstract
A case study of a debris slide (estimated volume of about 35,000 m3) is described in this paper. This slide occurred in April 2009 in the North Western Italian Alps (Aosta valley) and damaged the SR25 road along the Valgrisenche valley. Ground investigations started with severe safety and logistic issues being posed. Given the need to open as soon as possible the road, the design of the landslide stabilization works was carried out using a “design as you go” approach. The stabilization measures were conceived to be flexible in order to allow for changes and integration during construction, in line with the progressive refinement of the geological–geotechnical slope model being developed. Back analysis by means of the limit equilibrium method (LEM) and the finite element method (FEM) was used. Groundwater level rise following heavy rainfall and spring snow melting was found to be the main cause of the debris slide. The stabilization works were designed by using both the LEM and FEM methods. The stability conditions of the engineered slope were assessed based on the available performance monitoring data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.