Abstract

The site selection for hybrid offshore wind and wave power plants (HOWWPP) is a critical step to a successful HOWWPP project. In this study, a four-stage framework is presented for determining the most suitable marine areas for the siting of HOWWPP. First, wind and wave energy potentials are assessed as a foundation for the implementation of a HOWWPP project. Next, unsuitable areas for the siting of HOWWPP are determined based on exclusion criteria to avoid any potential conflicts of marine spatial planning. Feasible areas (not satisfying the exclusion criteria) are classified and converted into spatial layers separately according to evaluation criteria. Then, the triangular fuzzy analytic hierarchy process is applied to calculate the evaluation criteria weights. Finally, the site suitability of feasible areas is calculated using the weighted overlay approach and then categorized into five classes. To validate the effectiveness of the proposed framework, a case study in Hainan Province of China was conducted. The results indicate that the marine areas with medium to very high suitability are approximately 1312 km2 (4.7% of the study area) for the deployment of HOWWPP. The obtained results of this study can support potential planners in selecting marine areas for the installation of HOWWPP.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.