Abstract

Jacking formwork system has been widely used in the construction of tall buildings and modularized low-position jacking steel platform formwork system is made up of several assembled and turnover subsystems, including steel truss platform system, steel columns supporting system, formwork and rack system, two-way-acting hydraulic jack and its control system.The paper described the application of the system in Fuzhou Yu Yang Central Golden Plaza Project and construction site monitoring were conducted. According to the site monitoring result, the performance of the jacking formwork system is further illustrated. In the end some suggestions were put forward to ensure construction safet .

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.