Abstract

AbstractThe conservation treatments carried out between June 1992 and August 1993 on the architectural remains of a Byzantine basilica in Petra, Jordan, during and immediately after the excavation are described. The treatments completed during excavation included: stabilization and consolidation of certain sections of the basilica's sandstone ashlar masonry; cleaning and consolidation of the unpainted lime wall plaster decorating the basilica interior; cleaning and consolidation in situ of the extensive remains of a figurative mosaic pavement in the two side aisles, and the fragmentary remains of the opus sectile pavement in the central aisle. The consolidation treatments included injection grouting using hydraulic mortar mixes produced in Italy, and mortar repairs using slaked lime and hydraulic lime. The existence of the mosaic required preventive conservation measures during the excavation, such as the construction of a temporary shelter over the site during the winter, the use of temporary protective ...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call