Abstract
UD Kerupuk Rengganis is a medium-sized small business located in Bandung Rejo Village Rt 02 Rw 01 Bayan sub-district. At present UD Kerupuk Rengganis is still calculating the cost of production using traditional costing systems. The traditional cost system is the costs associated with the production process, which is relatively low, not counted all. For example, the factory overhead costs (electricity and water costs), so the cost of production determined is not right. Based on the description above, in this study an information system for calculating the cost of production of UD Kerupuk Rengganis will be made. The author carries out data collection techniques obtained using literature study techniques, interviews, and observations. The system design used is web-based, which can facilitate adding, deleting, printing production data, and making reports more effective and efficient, such as simplifying data searches so as not to spend a lot of time. The purpose of writing this is to apply the Production Cost Calculation Information System for UD Kerupuk Rengganis.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.