Abstract
CV. Infotech Media is a national private company with legal entity which is engaged in website, desktop andandroid-based software development services. At the time of construction, projects often experience delays inproject completion due to several factors, namely in determining the estimated work time, the determination of theestimated work time often experiences discrepancies because the determination of the time estimate still uses roughestimates and ignores the possibility of optimistic and pessimistic times. In addition, there is no system thatcalculates which jobs should be prioritized and which jobs can be postponed for some time. Based on the problemsthat occur today, a project scheduling information system is needed at CV. Infotech Media. The method used tosolve this problem uses the Program Evaluation and Review Technique (PERT) method to calculate the right timeestimate and determine the critical path where there is work that is prioritized or cannot be postponed. Based onthe test results achieved, the project scheduling information system has been able to overcome the problems thatexist in the company, namely, calculating the right time estimate, providing information about the critical pathand making a schedule in the form of a Gantt Chart
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.