Abstract

We study a single-machine scheduling problem where the processing times of jobs simultaneously have the time-dependent deteriorating and the job-dependent learning effects under a deteriorating machine maintenance consideration. We consider four different performance measures. For the first three problems with the objectives of minimizing the makespan, minimizing the total completion time and minimizing the total absolute differences in completion times, we develop three polynomial algorithms to solve each of them. More efficient algorithms are designed to solve their special cases. For the problem with objective of minimizing the sum of earliness, tardiness, due-window starting time, and due-window size costs, we propose two optimal properties which enable us to develop a polynomial algorithm to solve it. We also consider three special cases of this problem, and more efficient algorithms are developed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.