Abstract
We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a schedule that minimizes the makespan, subject to periodic maintenance and nonresumable jobs. We first prove that the worst-case ratio of the classical LPT algorithm is 2. Then we show that there is no polynomial time approximation algorithm with a worst-case ratio less than 2 unless P = NP , which implies that the LPT algorithm is the best possible.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.