Abstract

This study is concerned with the problem of finding an optimal sequence that minimises the weighted sum of a quadratic function of job lateness on a single machine where an idle time is allowed to be inserted only before the processing of the first job begins. We first prove that the solution method of Sen et al. (1995) for the problem does not work because their ordering rule for adjacent jobs is not applicable to nonadjacent jobs. We then develop an exact algorithm for this Non-deterministic Polynomial-time hard (NP-hard) problem based on a precedence relation structure among adjacent jobs. The algorithm considers the lateness cost of an incumbent sequence as the initial upper bound, and incorporates some improved lower bounds and a number of effective branching rules into a Branch-and-Bound (BB Revised 02 February 2009; Accepted 07 February 2009]

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.