Abstract
Nowadays, the use of pile-plate foundations has received extensive development, which takes into account the soil inclusion in the work under its plate part. We proposed a new design of a plate-pile foundation and an engineering method for determining the main parameters of such a foundation, where one of the parameters is the piles settlement under the action of the negative friction forces Pn. As far as is known, field testing of production piles using pressing-in loads is the most reliable method for determining their actual load-bearing capacity. We carried out full-scale tests of a multi-section pile with the loading at depth, on the basis of which a comparative analysis of the settlement of single piles from the action of the negative friction forces, obtained with the help of adapted and existing methods and experimental data
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: ACADEMIC JOURNAL Series: Industrial Machine Building, Civil Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.