Abstract

We consider single machine scheduling problems with deteriorating jobs and SLK/DIF due window assignment, where the deteriorating rates of jobs are assumed to be job-dependent. We consider two different objectives under SLK and DIF due window assignment, respectively. The first objective is to minimise total costs of earliness, tardiness, due window location and due window size, while the second objective is to minimise a cost function that includes number of early jobs, number of tardy jobs and the costs for due window location and due window size. We study the optimality properties for all problems and develop algorithms for solving these problems in polynomial time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.