Abstract
We consider the single machine total flow time problem in which the jobs are non-resumable and the machine is subject to preventive maintenance activities of known starting times and durations. We propose a branch-and-bound algorithm that employs powerful optimality properties and bounding procedures. Our extensive computational studies show that our algorithm can solve large-sized problem instances with up to 80 jobs in reasonable times. We also study a two-alternative maintenance planning problem with minor and major maintenances. We give a polynomial-time algorithm to find the optimal maintenance times when the job sequence is fixed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.