Abstract
In the single machine scheduling problem with job delivery to minimize makespan, jobs are processed on a single machine and delivered by a capacitated vehicle to their respective customers. We first consider the special case with a single customer, that is, all jobs have the same transportation time. Chang and Lee (2004) proved that this case is strongly NP-hard. They also provided a heuristic with the worst-case performance ratio [Formula: see text], and pointed out that no heuristic can have a worst-case performance ratio less than [Formula: see text] unless P = NP. In this paper, we provide a new heuristic which has the best possible worst-case performance ratio [Formula: see text]. We also consider an extended version in which the jobs have non-identical transportation times and the transportation time of a delivery batch is defined as the maximum transportation time of the jobs contained in it. We provide a heuristic with the worst-case performance ratio 2 for the extended version, and show that this bound is tight.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.