Abstract

We consider a non-preemptive single machine scheduling problem with forbidden intervals. Associated with each job is a given processing time and a delivery time to its customer, when the processing of the job is complete. The objective is to minimize the time taken for all the jobs to be delivered to the customers. The problem is strongly NP-hard in general. In this study, we show that the case with a fixed number of forbidden intervals can be solved by a pseudo-polynomial time algorithm, while no polynomial time approximation algorithm with a fixed performance ratio exists for the case with two forbidden intervals. We also develop a polynomial time approximation scheme (PTAS) for the case with a single forbidden interval.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.