Abstract
In this article we consider a single-machine scheduling problem with decreasing time-dependent job-processing times. Decreasing time-dependent job-processing times means that its processing time is a non-increasing function of its execution start time. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in the descending order of their normal processing times if they are placed before the job with the smallest normal processing time, but in the ascending order of their normal processing times if placed after it. We prove several other properties of an optimal schedule, and introduce two heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Chinese Institute of Industrial Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.