Abstract
This paper deals with single-machine scheduling problems with decreasing linear deterioration, i.e., jobs whose processing times are a decreasing function of their starting times. In addition, the jobs are related by parallel chains and a series–parallel graph precedence constraints, respectively. It is shown that for the problems of minimization of the makespan, polynomial algorithms exist.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.