Abstract

In scheduling problems with generalized due dates (gdd), the due dates are specified according to their position in the sequence, and the j-th due date is assigned to the job in the j-th position. We study a single-machine problem with generalized due dates, where the objective is maximizing the number of jobs completed exactly on time. We prove that the problem is NP-hard in the strong sense. To our knowledge, this is the only example of a scheduling problem where the job-specific version has a polynomial-time solution, and the gdd version is strongly NP-hard. A branch-and-bound (B&B) algorithm, an integer programming (IP)-based procedure, and an efficient heuristic are introduced and tested. Both the B&B algorithm and the IP-based solution procedure can solve most medium-sized problems in a reasonable computational effort. The heuristic serves as the initial step of the B&B algorithm and in itself obtains the optimum in most cases. We also study two special cases: max-on-time for a given job sequence and max-on-time with unit-execution-time jobs. For both cases, polynomial-time dynamic programming algorithms are introduced, and large-sized problems are easily solved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.