Abstract

We study single machine scheduling problems. Generalised due dates are assumed, i.e. job due dates are specified according to the positions of the jobs in the sequence, rather than their identity. Thus, assuming that due dates are numbered in a non-decreasing order, the jth due date refers to the job assigned to the jth position. In addition, we allow the option of job rejection, i.e. not all jobs must be processed. In this case, the scheduler is penalised for each rejected job, and the total rejection cost becomes part of the objective function. Two objective functions are considered: maximum tardiness plus rejection cost, and total tardiness plus rejection cost. Both problems are proved to be NP-hard. Pseudo-polynomial dynamic programmes and efficient heuristics are introduced and tested numerically.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.