Abstract

In this paper, we introduce a single-machine scheduling problem with an exponentially time-dependent learning effect. The processing time of a job is assumed to be an exponential function of the total normal processing time of jobs already processed before it. For such a scheduling problem, we first provide the upper bound for the maximum lateness and for the total weighted completion time. Next, we show that problems with the following criteria: makespan, the total completion time, the total weighted completion time, the total earliness/tardiness penalties and the maximum lateness under some agreeable conditions, are polynomially solvable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.