Abstract
This paper considers the multi-criteria scheduling problem with total completion time, maximum lateness, and maximum earliness as the objectives. The problem is a minimisation problem; the total completion time, a MIN-SUM problem, the maximum earliness, a MIN-MAX problem, and the maximum lateness, a MIN-MAX problem. Though, the problem is NP-hard, shortest processing time (SPT) rule, yields optimal for total completion time while early due date rule (EDD) is the optimal solution for maximum lateness and maximum earliness if each criterion were to be considered separately. Two heuristics, named SOL I and SOL II were proposed and the results for each of the criteria were compared to the optimal of the sub-problems. Results of the computational experiment on small job-sizes (5 ≤ n ≤ 30) and large job-sizes (40 ≤ n ≤ 100) show that the two heuristics results are not significantly different from the optimal at 99% significant level for total completion time and maximum lateness performance measures. However, for maximum earliness, the optimal solutions are significantly better than the two proposed heuristics.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have