Abstract

ABSTRACTIn this article, the common due-window (CON DW) assignment and scheduling problem on a single machine is studied. The minmax CON DW problem is extended by considering convex resource allocation. In extended problems, the scheduler needs to find, in addition to the optimal job sequence, the start time and size of the due window, as well as the actual processing time of each job that optimizes a cost function. First, the focus is on minimizing the maximum scheduling criteria subject to maximal resource consumption. Next, the complementary problem of minimizing resource consumption subject to an upper bound on the scheduling measure is solved. For these problems, a closed form solution is provided, with computational complexity of , where is the number of jobs. An extension to the first problem is offered by assuming general position-dependent workloads, proving that the problem remains polynomially solvable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.