Abstract
In this paper, we consider the single-machine group scheduling problems with deterioration and resource constrains. In this model, the jobs in the same group shouldn't be separated, the setup time of a group is a positive strictly decreasing function of the amount of resources consumed, and the processing time of a job is a linear function of its starting time. The linear increasing deterioration model is considered. Two versions of objectives, minimizing the total resource consumption under the makespan constrains and minimize the makespan under the total resource consumption constrains, are discussed. Based on the characterizations of optimal schedules that established for both models, the optimal allocation methods are presented, respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.