Abstract

We study single machine batch scheduling with release times. Our goal is to minimize the sum of weighted flow times (or completion times) and delivery costs. Since the problem is strongly $\mathcal{NP}$ -hard even with no delivery cost and identical weights for all jobs, an approximation algorithm is presented for the problem with identical weights. This uses the polynomial time solution we give for the preemptive version of the problem. We also present an evolutionary metaheuristic algorithm for the general case. Computational results show very small gaps between the results of the metaheuristic and the lower bound.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.