Abstract

We consider the problem of scheduling n jobs on a single machine where each job has a deadline and a processing time that is a linear decreasing function of the amount of a common discrete resource allocated to the job. Jobs may be combined to form batches containing contiguously scheduled jobs. For each batch, a constant set-up time is needed before the first job of the batch is processed. The completion time of each job in a batch coincides with the completion time of the last job in the batch. A schedule specifies the sequence of jobs and the size of each batch, i.e. the number of jobs it contains. The objective is to find simultaneously a resource allocation and a schedule which is feasible with respect to the deadlines so as to minimize the total weighted resource consumption. The problem is shown to be NP-hard even for the special case of common parameters. Two dynamic programming algorithms are presented for the general problem, as well as a fully polynomial approximation scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.