Abstract

This paper considers the static single facility scheduling problem where the processing times of jobs are a monotonically increasing function of their starting (waiting) times and the objective is to minimize the total elapsed time (called the makespan) in which all jobs complete their processing. Based on the combinatorial analysis of the problem, an exact optimization algorithm is developed for the general processing time function which is then specialized for the linear case. In view of the excessive computational burden of the exact optimization algorithm for the nonlinear processing time functions, heuristic algorithms are proposed. The effectiveness of these proposed alogrithms is empirically evaluated and found to indicate that these heuristic algorithms yield optimal or near optimal schedules in many cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.