Abstract
Logic-based Benders decomposition can combine mixed integer programming and constraint programming to solve planning and scheduling problems much faster than either method alone. We find that a similar technique can be beneficial for solving pure scheduling problems as the problem size scales up. We solve single-facility non-preemptive scheduling problems with time windows and long time horizons. The Benders master problem assigns jobs to predefined segments of the time horizon, where the subproblem schedules them. In one version of the problem, jobs may not overlap the segment boundaries (which represent shutdown times, such as weekends), and in another version, there is no such restriction. The objective is to find feasible solutions, minimize makespan, or minimize total tardiness.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.