Abstract

This paper addresses simultaneous scheduling of jobs, machines and tools considering tool transfer times (TTTs) between machines, to generate best optimal sequences that minimise makespan in a multi-machine flexible manufacturing system (FMS). Performance of FMS is expected to improve by effective utilisation of its resources, by proper integration and synchronisation of their scheduling. Aim of this paper is to address joint scheduling of jobs, machine and tools in an FMS consisting of machines, central tool magazine and tool transporter considering TTTs. Three nature-inspired algorithms namely Symbiotic Organisms Search algorithm, Crow search algorithm and Flower pollination algorithm, are proposed for solving joint jobs, machine and tool scheduling problems considering TTTs between machines with minimum makespan as objective. The proposed algorithms are numerically tested on various problems and results are compared. The results show that FPA algorithm yields better results for simultaneous scheduling of jobs, machines and tools considering TTTs between machines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.