Abstract

Regular and non-regular production can often be found in multipurpose batch plants, requiring two distinct operating strategies: campaign and short-term production. This paper proposes a solution approach for simultaneous scheduling of campaign and short-term products in multipurpose batch plants. Regular products follow a cyclic schedule and must cover several product deliveries during the scheduling horizon, while non-regular products have a non-cyclic schedule. The proposed approach explores the Resource-Task Network (RTN) discrete-time formulation. Moreover, a rolling horizon approach, and reformulation and branching strategies have been applied to deal with the computational complexity of the scheduling problem. Real case instances of a chemical–pharmaceutical industry are solved, showing the applicability of the solution approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.