Abstract

This contribution presents the optimization of parallel distribution between electricity and heat production for a geothermal plant. The geothermal fluid is split into two streams, one used for an Organic Rankine Cycle (ORC) system, and the other for a District Heating Network (DHN). The superstructure to be used for the optimization problem includes the ORC components, one of which is an optional internal heat exchanger which allows exchange between the outlet streams of the turbine and the pump. Each of the components' characteristic dimensions (used in the installation cost) is an optimization variable. The operating cost of the ORC is proportional to the installation cost. The superstructure also includes the DHN topology constituted by a definite consumer and optional consumers. A Mixed Integer Non-Linear Programming (MINLP) optimization problem is formulated and solved using the GAMS software. The strategy used to overcome the critical point of the initialization of the MINLP problem is presented. It consists in dividing the general problem into sub-problems which are solved successively. Three different academic study cases are compared to a reference case. The results validate the stability and the robustness of this optimization tool. A sensitivity analysis is performed in geothermal source conditions. All these results highlight the relevance of the simultaneous approach.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call