Abstract

Strict environmental regulations and increasing public awareness toward environmental issues force many companies to establish dedicated facilities for product recovery. All product recovery options require some level of disassembly. That is why, the cost-effective management of product recovery operations highly depends on the effective planning of disassembly operations. There are two crucial issues common to most disassembly systems. The first issue is disassembly sequencing which involves the determination of an optimal or near optimal disassembly sequence. The second issue is disassembly-to-order (DTO) problem which involves the determination of the number of end of life (EOL) products to process to fulfill the demand for specified numbers of components and materials. Although disassembly sequencing decisions directly affects the various costs associated with a disassembly-to-order problem, these two issues are treated separately in the literature. In this study, a genetic algorithm (GA) based simulation optimization approach was proposed for the simultaneous determination of disassembly sequence and disassembly-to-order decisions. The applicability of the proposed approach was illustrated by providing a numerical example and the best values of GA parameters were identified by carrying out a Taguchi experimental design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.