Abstract

In this paper we compare two production planning formulations in a rolling horizon setting. The first is based on fixed lead times that are a multiple of the period length, while the second uses non-linear clearing functions. A scaled-down simulation model of a wafer fab is used to assess the performance of the two formulations. We examine the impact of the planning window and period length on the performance of the production planning formulations. The performance advantage of clearing functions that is observed in a static setting can be also observed in a rolling horizon setting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.