Abstract

For example, Wein (1988) compared various release control strategies and scheduling rules and provided the better combinations of release control strategy and scheduling rule for three kinds of HP 24 models. Peyrol et al. (1993) implemented a simulated annealing methodology to determine the input order of a given set of products so as to minimize the average residence time of these products in the plant with unlimited intermediate storage policy. They developed a discrete simulation program to determine the value of the objective function. This method was applied to a semiconductor circuit fabrication plant of MOTOROLA Inc. Thompson (1996) described a simulation-based finite capacity planning and scheduling software to allow human planners to make better decisions. This tool improved cycle time, throughput, and equipment utilization significantly without adding additional equipment and personnel. Baudouin et al. (1995) presented information system architecture and a decision support tool to allow admissible scheduling solutions in a semiconductor device manufacturing fab.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.