Abstract
The economics of a materials management system is defined by the size of the shipments, the scheduling strategy that allows contractors to handle uncertainty and variability in the supply chain, and the timing of the shipments, which in turn depend on the environment in which the project is taking place. This study presents a simulation-based decision support system to assist contractors in selecting the most economical rebar management system prior to the start of construction by recommending lot sizes (large, small), a scheduling strategy (optimistic, neutral, pessimistic), and buffer sizes (large, medium, small) given the conditions of the project. This model is of benefit to contractors and researchers because it generates the probable cost of inventory of 18 alternative rebar management systems ranging from just in case (JIC) to just in time (JIT) and including different variations in between. It allows contractors to select the alternative with least cost of inventory at the planning stages of a project. The simulation model was tested by using actual data obtained from a trade center project in Istanbul, Turkey. As expected, the test indicated that JIC was the most economical rebar management system in a case study conducted in a developing country, as it generated a savings of 4.8% over JIT.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.