Abstract
To generate dynamic planning for coal mine safety investment, this study applies system dynamics to decision-making, classifying safety investments by accident type. It validates the relationship between safety investments and accident cost, by structurally analyzing the causality between safety investments and their influence factors. Our simulation model, based on Vensim software, conducts simulation analysis on a series of actual data from a coalmine in Shanxi Province. Our results indicate a lag phase in safety investments, and that increasing pre-phase safety investment reduces accident costs. We found that a 24% increase in initial safety investment could help reach the target accident costs level 14months earlier. Our simulation test included nine kinds of variation trends of accident costs brought by different investment ratios on accident prevention. We found an optimized ratio of accident prevention investments allowing a mine to reach accident cost goals 4months earlier, without changing its total investment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Mining Science and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.