Abstract

This paper deals with the technical feasibility and economic viability of a solar thermal power plant using parabolic trough collectors in Greece. The power plant is to be installed in the island of Rhodes and its power output will be 8.55 MW. Power plant simulation is carried out using TRNSYS software (STEC library) and economic issues of the project such as initial cost of investment, operation and maintenance (O&M) and energy costs will be analyzed. It was found that for the particular investment, considering a 75% of initial investment cost loan (with a 10-year period), the payback period will be approximately 13 years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.